-
Forterro Launches industry rich AI platform: MyForterro.ai - 24 mins ago
-
Retail supply chains Still Waiting For AI-Powered Shopping Revolution - about 1 hour ago
-
QUECLINK WINS 2026 AUTOTECH BREAKTHROUGH AWARD FOR INNOVATIVE SATELLITE-ENABLED VEHICLE TRACKING SOLUTION - about 1 hour ago
-
Are you getting the best value from your forklift fleet? - 1 day ago
-
Forgepoint raises $9.8M to help manufacturers quote faster and win more business - 1 day ago
-
Evos Raises $9M to Bring Autonomous Operators to Industrial Businesses of All Sizes - 1 day ago
-
Returns to Repeat Purchases: Why the Returns Experience Matters - October 13, 2026
-
Loops raises $3.5M to build the AI operating system for commerce - October 12, 2026
-
Military transition into a great lifting career - October 8, 2026
-
AI order-to-cash platform Stuut raises $52.5M Series B after unlocking 40% more cash for enterprises - October 7, 2026
Leading composite door manufacturer Solidor has installed two van docking ramps from Thorworld Industries at its new Stoke-On-Trent facility, resulting in significant improvements to both the safety and efficiency of its loading operations.
During the design phase of its new facility, Solidor had originally specified adjustable dock levellers from another manufacturer. However, after moving into the premises in June 2022, Solidor discovered that the dock levellers were unsuitable for the vans used by the company’s logistics partners. Crucially, they couldn’t be lowered enough to allow the vans to be loaded or unloaded at the dock.
This led to a significant logistics challenge as Neil Bancroft, Operations Director at Solidor, explained: “Our original loading dock design didn’t consider the array of different vehicle sizes we use, which left us with significant ergonomic and safety issues for our loading operations.
“Safety is our number one priority at Solidor, and we needed a new solution that both met our high standards and allowed us to fully utilise our loading infrastructure.”
Thorworld, through its dealer Loading Bay Service Ltd, designed, delivered, and installed a complete loading solution. This consisted of two mobile van ramps, complete with additional safety features such as Bimagrip Antislip coating, expanded metal decking and side access platforms.
Solidor’s drivers were involved in the selection and design phase of the project, providing vital feedback to ensure the most user-friendly solution.
The van loading ramps were also supplied in non-standard Saffire Blue (RAL 5003) paint as per request.
The new loading solution now allows vans to reverse directly to the facility loading bay, yielding a significant improvement in safety and resulting in a much smoother loading operation for the company.
Explaining why Solidor approached Thorworld, Neil Brancroft added: “We needed a robust turnkey solution and Thorworld was a local company that could do just that. The technical information, speed of delivery and expert advice provided was excellent and we’re really pleased with the level of service provided”.
“The feedback from the drivers has been really positive, the new ramps are suitable for all our vehicle sizes and the safety risk has been eliminated”.
Warren Craig, Director of Loading Bay Service Ltd commented: “This was a great project and we’re always happy to receive positive feedback from the people who use our solutions every day”.
“Van ramp solutions such as this are becoming more common as businesses loading operations adapt to the rapidly changing logistics environment.”
For more information on Solidor: https://www.solidor.co.uk/
For more information on Thorworld Industries: https://www.thorworld.co.uk/




