-
CLOSING UP FOR WINTER - 4 hours ago
-
New report shows that around nine in 10 UK e-commerce firms now prioritise sustainability - 4 hours ago
-
Automation from KNAPP pushes order cut-off back by 6 hours for Matalan - 5 hours ago
-
Bridgestone Debuts Two New Truck Tyres for Mild On/Off Segment, Delivering Lasting Performance on Any Terrain - 1 day ago
-
Combilift Unveils “The Grinch Christmas Video” – A Festive Tale of Magic and Innovation - 1 day ago
-
2024 Budget makes business case for warehouse tech more compelling - December 3, 2024
-
WIALON AND QUECLINK WIRELESS SOLUTIONS TO SHARE GUIDANCE ON COLLABORATIVE TELEMATICS SOLUTIONS FOR FLEET SUCCESS - November 27, 2024
-
SURECAM AND BLACKOUT TECHNOLOGIES CREATE INDUSTRY-FIRST VIDEO TELEMATICS WITH INTEGRATED MOBILE DEVICE BLOCKING - November 26, 2024
-
ZEROMISSION TARGETS NORTH AMERICAN GROWTH WITH SENIOR BUSINESS DEVELOPMENT APPOINTMENT - November 25, 2024
-
DERRY BROS LAUNCHES AUTOMATED DECLARATIONS TO STREAMLINE CUSTOMS PROCESS FOR INTERNATIONAL FREIGHT MOVEMENTS - November 22, 2024
Rubb supports local automotive drive with new storage warehouse.
Leading automotive plastic component supplier Nifco UK called on Rubb to design and construct a custom storage building solution.
Nifco UK is based close to Rubb in Stockton-on-Tees and has been in business since 1967, formerly known as Elta Plastics Ltd. Nifco is a global company employing over 10,000 people in 17 countries. The company specialises in designing and manufacturing plastic components for the global automotive industry, which are used in the interior, exterior and engines of vehicles.
Rubb supplied Nifco UK with a custom designed structure to maximise available space. The storage warehouse measures 28.3m wide x 48 long with an eaves high of 6.5m for the clearance of lorries and internal racking units. The building was also designed with two fire access doors and a guttering system. With the building construction being so close to an existing canopy, the Rubb team had to make sure the space in between the buildings was weather tight, with a PVC fabric, sealed termination cover.
The steel frame of the building is hot dip galvanized after production to eliminate any chance of corrosion. The frame comes with a 25-year warranty and the PVC coated, light weight fabric cladding requires very low maintenance and comes with a manufacturers’ warranty of 10 years.
While constructing the new Rubb storage facility, the team worked around the normal day-to-day running of the Nifco business. As well as serving as a pallet storage facility, the building has two 6m wide x 6m high openings at each end to accommodate the entrance and exit of the transport through road. As the structure was being built across a busy area of the business, the Rubb team needed to adapt the building plan to fit in with working hours and area usage to cancel out any downtime.
The Rubb team worked closely with Nifco plant engineering manager, Jim Bell, to make sure the proposed structure was going to be the perfect solution for Nifco’s pallet storage needs. Jim said: “There were a number of reasons why Nifco went with a Rubb structure. The design of the building and the way it was manufactured demonstrated that this structure was built with longevity in mind. The building is easily adaptable to accommodate accessories needed for the building to perform. The Rubb company is local to us in the North East, and like Rubb, Nifco is a firm believer of supporting local business.”